Let's grow your business. 2 new positions just opened Tuesday, 24 November. Book a free call today.
Uncategorised 11 min read

Should custom home builders charge a pre-construction fee?

Should custom home builders charge a pre-construction fee?: Email, SMS and voice outreach from an AI sales agent converging into a booked calendar appointment.
Email, SMS and voice outreach from an AI sales agent converging into a booked calendar appointment.

Yes: custom home builders should charge a pre-construction fee once free estimating costs more than about 40 unpaid hours per contract won, or once one estimate needs 30 or more hours because the plans are incomplete. At 20 hours an estimate and a 1-in-4 win rate, free bids burn 60 unpaid hours per signed home.

The short answer from LeadsNow AI: LeadsNow recommends charging for pre-construction when your lost estimating time passes one working week (40 hours) per contract won, which happens at a 25% win rate on 20-hour estimates and at a 15% win rate on 10-hour estimates. Keep the first ballpark free, charge a fixed, lump-sum fee for the detailed work, and decide in writing whether it is credited to the build.

Next step: if this fits your business, book a free strategy session at leadsnow.ai/strategy-session/ – a 2-minute fit check, then pick a time.

Rules of thumb for a pre-construction fee (the first three are arithmetic from the worked table below; the last two are sourced in the sections further down):

  • Unpaid hours per contract won = estimating hours per job x (1 – win rate) / win rate. Twenty hours at a 25% win rate is 20 x 0.75 / 0.25 = 60 hours.
  • The One-Week Rule: above 40 unpaid hours per contract won, charge at least a nominal fee; at or below it, free estimating is a defensible sales cost.
  • Plan completeness decides the fee type. A full set of plans needs pricing, not design, so a nominal fee fits; a sketch or a wish list needs 30-plus hours of development, so a full agreement fits.
  • Price it as a lump sum and collect at least half at signing. One construction coach recommends exactly this in Pro Builder.
  • Keep the agreement separate from the building contract. Australian deposit caps can apply to money taken before the build.

Free ballpark, nominal fee or full pre-construction agreement: which fits the job?

A custom home builder has three realistic options for pre-construction, and the right one depends on how complete the client’s plans are and how many estimating hours the job will take. The table is LeadsNow’s decision rule; hours and fee bands are examples, not a survey.

Pre-construction fee decision table: a full agreement fits once a job needs 30 or more estimating hours or the plans are a sketch; a free ballpark fits only first conversations of 2 hours or less.
Situation Plan completeness Estimating hours (example) Option Published structure to copy
First enquiry, any size of home None or a wish list 2 or fewer Free ballpark range, stated as preliminary Verbal or per-square-foot range, no line items
Client brings an architect’s full set and asks for a bid Complete drawings and specifications 10 to 20 Nominal estimating fee One remodeller’s $500 to $1,000 fee (US, 2005)
Custom home where you control design and pricing Sketch, concept or partial set 30 to 80 Full pre-construction agreement Lump sum, at least 50% on signing, often credited to the build
Large or complex custom home, many selections open Concept only 40 or more Full agreement with an hours cap and an overrun rate $10,000 for 40 hours, then an hourly rate (US, 2012)

The table separates whether to charge (win rate and hours) from what to charge for (how much design is missing): pricing complete drawings is an estimate, finishing them is design.

How it works

Deciding on a pre-construction fee in four steps

01

Pull last year’s estimates

Count the estimates you priced, the hours each took and how many became contracts.

02

Work out unpaid hours

Multiply hours per estimate by (1 – win rate) / win rate. Above 40 hours per contract won, charge.

03

Match fee to plans

Complete drawings get a nominal estimating fee; sketches get a full lump-sum agreement with an hours cap.

04

Set credit and timing

Decide in writing whether the fee is credited to the build and collect the upfront share on signing.

Measure what free estimating costs you per signed home before choosing a fee type or a credit.

MAKE MORE SALES.

Pay-Per-Result pricing — We scale sales HARD aligned to your interests, better than anyone else.

Frequently asked questions

How much should a custom home builder charge for pre-construction?

There is no published industry rate. Price the hours the work will take at your own rate and set it as a lump sum. Published examples range from $500 to $1,000 for estimating a full set of plans (JLC, 2005) to $10,000 for 40 hours of design and estimating (JLC, 2012).

Is a pre-construction fee the same as a deposit?

In Australia it should be kept apart from one. HIA advises ACT builders to keep a preliminary agreement separate from the building contract and not to call the payment an initial deposit, and Victoria currently caps deposits at 5% on contracts of $20,000 or more, with new contract laws due by 1 December 2026.

How much should a builder collect up front for a pre-construction agreement?

Construction coach Todd Dawalt recommends a lump-sum fee with at least 50% collected on signing, writing in Pro Builder in 2024. Dennis Dixon took 25% down and the rest in two further payments.

Will charging for estimates lose me clients?

Some, and the number depends on your market. Magleby Construction’s CFO told Custom Builder that only one new-home client and 20% of remodelling clients had dropped out since he joined, but that is one builder’s account, not a benchmark.

How many unpaid hours does free estimating cost per contract won?

Free estimating costs the hours spent on every lost bid, spread across the contracts won. The formula is estimating hours per job x (1 – win rate) / win rate. No industry body publishes a custom-builder bid win rate, so the win rates below are labelled assumptions; the hours bands follow a range a construction coach gives for a single estimate, and the $80 hourly cost is an assumption you should replace with your own.

At an assumed $80 an hour, a 20-hour estimate at a 25% win rate costs 60 unpaid hours ($4,800) per contract won, past the 40-hour One-Week Rule.
Hours per estimate Win rate (assumption) Lost bids per win Unpaid hours per contract won Cost at $80/hour (assumption) One-Week Rule
10 50% 1 10 $800 Free is defensible
10 25% 3 30 $2,400 Free is defensible
10 15% 5.7 56.7 $4,533 Charge
20 50% 1 20 $1,600 Free is defensible
20 25% 3 60 $4,800 Charge
20 15% 5.7 113.3 $9,067 Charge
30 50% 1 30 $2,400 Free is defensible
30 25% 3 90 $7,200 Charge
30 15% 5.7 170 $13,600 Charge

A builder who wins half of the homes it prices stays under one working week of lost time per contract at every hours band in the table. At a 25% win rate the line is crossed at 20 hours an estimate, and at 15% it is crossed even at 10 hours. Use your last 12 months of estimates to find your own row.

The lost bids are not worthless after the fact. A quoted-but-never-signed client is a known buyer with a known budget, and LeadsNow treats that list as a pipeline in its database reactivation work on quoted-but-never-closed jobs.

Want this done for you? We book qualified sales appointments on a Pay-Per-Result basis — you only pay for calls that actually land in your calendar.

What do custom home builders charge for pre-construction, and how is it structured?

Published fixed pre-construction fees from builders and remodellers range from a $500 estimating fee to a $10,000 lump sum for 40 hours of work, and the structures matter more than the amounts. Every example below is from a named builder, remodeller or construction coach in the trade press, in US dollars, with the year it was published; none is a current market rate.

Published pre-construction fee structures from US builders, remodellers and one coach, 2005 to 2024: lump sums with an upfront share are the common thread, and three of six cases credit all or part of the fee to the build.
Builder or source (year) Fee Basis Payment timing Credited to the build?
Dixon Builders, Flagstaff, Arizona (JLC, 2012) $10,000 for 40 hours, then $85 an hour Fixed sum with an hours cap 25% down, then 50% and 25% Yes, if awarded the contract
Legal Eagle Contractors, Bellaire, Texas (Custom Builder, 2019) About $6,000 for a 3,000-square-foot home Fixed fee for planning and feasibility Not stated Not stated
Classic Homeworks, Denver (JLC, 2005) Between $500 and $1,000 Fee to estimate a full set of plans Not stated Not stated
Derrick Design, Huntsville, Alabama (JLC, 2005) About 4% of the project budget Non-refundable pre-paid deposit On signing a one-page planning document Yes, goes toward the job
Auger Building Company, Portsmouth, New Hampshire (JLC, 2005) Hourly; example $10,000 of a $30,000 deposit Hourly within a one-page agreement Deposit on signing the pre-construction contract Remaining $20,000 applied to a $250,000 contract
Todd Dawalt, construction coach (Pro Builder, 2024) Not stated (advice) Lump sum recommended At least 50% on signing Not addressed

Two structures recur. The first is a fixed lump sum with money up front: Dawalt’s Pro Builder advice is to charge a lump sum and collect at least 50% on signing, and Dixon caps his fee at a stated number of hours and bills overruns at a lower rate. The second is a percentage-of-budget deposit (Derrick Design); see the Australian guidance below before copying it. The hours bands in the worked table come from the same Pro Builder article: a builder may invest 10, 20 or 30-plus hours in one estimate.

Should a pre-construction fee be credited to the construction contract?

Crediting a pre-construction fee to the construction contract makes the fee free for clients who build with you and keeps it as payment from those who walk. Dennis Dixon credits the full fee if he is awarded the contract and writes that half his construction contracts start with a pre-construction agreement. Magleby Construction in Utah gives buyers a 50% credit on the first construction bill, which Custom Builder reported could be as much as $10,000 to $20,000; its CFO said that since he joined, only one new-home client and 20% of remodelling clients had dropped out.

A credit changes the economics in a specific way. It costs you nothing on the clients who were going to sign anyway, and it recovers hours only on the clients who pay the fee and then leave. A builder who loses most paid clients can credit only part of it. One remodeller in 2005 gave half back in tight markets and nothing in strong ones.

The kitchen and pool versions of this decision work the same way at a smaller scale; their break-even maths for a credited design fee is on whether pool builders should charge a design fee and whether kitchen renovators should charge a design fee. A custom home’s pre-construction phase runs longer; see the custom home builder enquiry-to-contract timeline.

If we can’t make you money, we don’t deserve yours.

Pay-Per-Result pricing — performance-based alignment.

50,769+
AI-booked appointments
7×
Average sales lift — median closer to 4×
Pay-Per-Result
Performance-based alignment

What rules apply to taking money before the building contract?

Australian builders face deposit caps and preliminary-agreement guidance that US trade-press structures do not account for, so check your state before copying any of them. This is general information, not legal advice.

  • Victoria: under the Domestic Building Contracts Act 1995, a deposit can be no more than 10% if the total contract price is under $20,000 and 5% if it is $20,000 or more, and a builder must give the client the domestic building insurance policy and certificate before taking a deposit or any other money for work worth more than $16,000 (Consumer Affairs Victoria, page updated 9 July 2025). These are the current rules: the Domestic Building Contracts Amendment Act 2025 takes effect by 1 December 2026, lets deposit limits be set in regulations and provides for separate preliminary agreements for plans, specifications and bills of quantity, so recheck the caps before you rely on them (Consumer Affairs Victoria).
  • ACT: the Housing Industry Association advises using a separate written preliminary agreement for items such as plans, specifications and approvals, not signing it at the same time as the building contract, and not expressing the amount as a percentage of the future contract or as an initial deposit. HIA adds that a builder can offer a credit from the future contract price as an incentive (HIA, 22 September 2023).
  • United States: deposit and contract rules are set state by state; check your state contractor licensing board before collecting money ahead of a construction contract.

A fee set as 4% of the budget, as in the 2005 US example, is the framing HIA tells ACT builders to avoid; a fixed sum for named preliminary work fits both markets.

Which builders should keep pre-construction free?

Builders who win half or more of the homes they price can keep pre-construction free, because the worked table shows their lost estimating time stays at or under 30 hours per contract won at every hours band in the table (10 to 30 hours an estimate).

The honest cost of charging is that some good clients will walk. The builders above say those who leave were price shoppers; that is their view, not a measured result. Trial the fee on new enquiries for one quarter and compare hours saved with margin lost. If more homes are lost than the hours justify, the issue is often lead quality or volume rather than the fee; that is the subject of builder lead generation and how custom home builders get clients.

Sources

  1. Pro Builder, 5 Questions About Preconstruction Service Agreements Answered, Todd Dawalt, 30 July 2024
  2. JLC, Getting Paid for Preconstruction Advice, Dennis Dixon, 2 October 2012
  3. JLC / Remodeling, Charging for preconstruction services, 7 February 2005
  4. Custom Builder, Getting Prospects to Pay for It (the Estimate), 19 September 2019
  5. Consumer Affairs Victoria, Deposits and payments for domestic building
  6. HIA, What is a preliminary agreement (ACT), 22 September 2023
  7. Consumer Affairs Victoria, New domestic building contract laws passed in Victoria

Pay-Per-Result appointments

See if we’re a fit

We book qualified sales appointments for you and you pay on results, not retainers. Our booking page asks a few quick questions so you find out in two minutes whether that model suits your business.

  • 50,769+ appointments booked without cold calling.
  • Pay-Per-Result pricing — you pay for booked, qualified calls.
  • Pick your own time on our live calendar, no phone tag.

View all articles

Pay-Per-Result · No retainers

Turn this into booked sales calls.

Our AI agents, trained on 50,769+ booked appointments, fill your calendar with pre-qualified buyers. You only pay when calls land.

Keep reading

Related on Leads Now AI

The thesis behind everything we do

Why Pay-Per-Result is the only marketing pricing model that aligns the agency with you

Leads Now AI is a 100% Pay-Per-Result marketing agency. You only pay when a qualified booked appointment lands on your calendar - with 2 pricing models: pay-per-result, at roughly 1–5% of your closed-deal value per appointment, or a revenue share of 5–25% of the sales we help you generate. Both bill on outcomes. Not on clicks. Not on lead-form fills. Not on retainer months. Not on “strategy hours.” If the calendar stays empty, you owe zero. See full pricing →

1. Incentives align

The agency only succeeds when you succeed. We eat the cost of bad ad creative, bad lists and no-shows. You never pay for our learning curve.

2. Self-selecting shortlist

Only an agency confident in its delivery can operate this model. The pool of Pay-Per-Result agencies is tiny precisely because most agencies can’t survive on it. Pick from the agencies who can.

3. Cost cannot detach from revenue

Priced as a share of the revenue we generate, your acquisition cost stays sustainable across LTV bands. A $500-membership business and a $50,000-engagement business can both run the model profitably.

4. No retainer trap

The standard engagement carries no monthly retainer - nothing arrives on your invoice regardless of outcome. No 6 or 12-month lock-in, no clawback on appointments already delivered, cancel any time with 14 days notice. Early-stage businesses that need the sales systems built first are quoted scoped groundwork up front, never a standing fee.

5. De-risks the pilot

Test before commitment. A small scope-based setup fee covers hard build costs; everything after that is purely outcome-linked. There’s no “we’ll see how it performs after $30k of spend.”

6. Forces agency discipline

If nobody books, or none of your meetings show, we eat the cost. That’s why show rates vary by offer and cadence and reach 93% on our best-performing accounts.

The volume argument

A fully-ramped human SDR produces on the order of $200,000 a year. They work one conversation at a time, sleep, take leave, and cap out at a territory. Our agents work every lead in the list in parallel - responding in seconds, following up indefinitely without getting bored, and adding capacity without adding headcount.

At 100 qualified booked appointments a month against a $5,000 average deal value, that is $500,000 of booked pipeline every month - roughly what one SDR produces in two and a half years.

Read that precisely: booked pipeline means appointments multiplied by your average deal value. It is not closed revenue - closing is your side of the table, and your close rate decides what lands. The inputs above are a worked example; we size them to your actual deal economics before quoting. What we can evidence on our own numbers: 50,769+ appointments delivered since 2017, database reactivation converting 4.4–8.9% on dormant CRM lists, and show rates that vary by offer and reminder cadence - up to 93% on our best-performing accounts.

The proof: 50,769+ AI-booked sales appointments delivered since 2017 across coaches, consultants, RTOs, course creators, finance brokers and B2B service firms in Australia, USA, UK, Canada, NZ and Europe. Named clients include Sam Tajvidi (121 Brokers), Marcus Wilkinson (Iron Body), Foundr, SheSells.online and Lambda Academy. Wikidata Q139846230. See full Pay-Per-Result pricing →