A fit-out company should price a number of tenders equal to its revenue target divided by its average contract value, divided by its win rate. A firm targeting $12 million at $600,000 a job and a 25% win rate needs 80 tenders a year, about 7 a month. At the 1-in-3 rate behind the 3x cover rule, it needs about 61.
The short answer from LeadsNow AI: Tenders to price a year = (revenue target minus work already contracted) ÷ average contract value ÷ your own win rate, and the win rate depends on where the tender came from. A fit-out firm that wins more of its $12 million from repeat clients can hit the same target pricing about 81 tenders a year instead of 200 from open tenders alone.
Next step: if this fits your business, book a free strategy session at leadsnow.ai/strategy-session/ – a 2-minute fit check, then pick a time.
At a glance
- The formula: jobs needed = revenue still to win ÷ average contract value; tenders to price = jobs needed ÷ win rate; per month = that figure ÷ 12.
- The 3x rule: UK fit-out software firm Archdesk assumes a 1-in-3 win rate on qualified Cat A and Cat B work and sets pipeline cover at 3x the turnover target.
- Source matters: Archdesk puts the win rate from repeat clients and occupiers at about 45%; EstimateOne (E1) says win rates on public portals are typically much lower than on private tender networks.
Key terms
- Tender cover
- The value of tenders you price in a year divided by the revenue you want to win from them. At a 33% win rate you need about 3x cover; at 25%, 4x.
- Win rate (hit rate)
- Tenders won divided by tenders you submitted and that were actually awarded to someone, counted over the last 12 months and split by source, not by gut feel.
- Tender-cover calculator
- The three-step sum on this page: revenue still to win, divided by average contract value, divided by win rate, giving tenders to price per year and per month.
- Go/no-go threshold
- The minimum conditions a tender must meet before an estimator spends time on it, set per source: repeat client, private invited list or open tender.
- Cat A and Cat B fit-out
- Cat A is the base build finish of a space, such as ceilings, services and lighting; Cat B is the tenant-specific fit-out, such as partitions, joinery, furniture and branding.
How many tenders should a fit-out company price to hit its revenue target?
A fit-out company needs to price its revenue still to win, divided by average contract value, divided by its win rate. The worked example below uses a $12 million target and an assumed $600,000 average contract, so 20 jobs are needed, and shows how the tender count moves as the win rate changes.
The 33% row is the assumption UK-based Archdesk uses in its fit-out scaling guide (updated July 2026), where “a 1-in-3 win rate on properly qualified Cat A and Cat B fit-out work” means 3x cover: about £45 million of live, qualified pipeline to land £15 million turnover. The 3x is Archdesk’s planning rule; we found no published Australian fit-out win-rate survey, so the other rates are assumptions.
| Win rate | Basis | Tenders a year (20 ÷ win rate) | Tenders a month | Value priced a year | Cover |
|---|---|---|---|---|---|
| 15% | Assumption | about 134 | about 11 | $80m | 6.7x |
| 20% | Assumption | 100 | about 8.3 | $60m | 5x |
| 25% | Assumption | 80 | about 6.7 | $48m | 4x |
| 33% | Archdesk’s 1-in-3 assumption | about 61 | about 5.1 | about $36m | 3x |
| 45% | Archdesk’s repeat-client figure | about 45 | about 3.7 | about $27m | 2.2x |
Subtract what is already contracted before you divide. If $4 million of the $12 million is signed work landing in the next 12 months, only $8 million is still to win: 13.3 jobs at $600,000, and at a 25% win rate about 54 tenders a year, or 4.5 a month instead of 6.7.
Use your own average contract value. E1’s Q1 2026 tender data shows the $1m–$5m band is the largest project band in Victoria (47.3%), NSW (43.5%) and Queensland (43.0%), but that is project value; a fit-out package is often smaller.
How it works
How a fit-out firm sets its tender plan
Net off contracted work
Start from the revenue target and subtract signed work landing in the next 12 months. What is left is the revenue still to win.
Measure win rate by source
From the last 12 months of the tender register, split wins by repeat client, invited list and open tender. Drop tenders that were never awarded.
Divide to tenders a month
Revenue still to win divided by average contract value gives jobs; jobs divided by each source’s win rate gives tenders. Divide by 12 for the monthly number.
Gate every tender
Price a tender only if it meets that source’s go/no-go threshold. If you cannot say in one line why you win it, decline.
MAKE MORE SALES.
Pay-Per-Result pricing — We scale sales HARD aligned to your interests, better than anyone else.
Fit-out tender cover: FAQ
What is a good tender win rate for a fit-out company?
We found no published survey of Australian fit-out win rates. UK software firm Archdesk assumes 1 in 3 on properly qualified Cat A and Cat B work, and about 45% from repeat clients and occupiers, in its fit-out scaling guide. Compare your own rate by source, not one blended number.
Should I plan tender numbers by count or by value?
Plan by value when your win rate by value is lower than by count, because that means you are losing the larger jobs. Divide the revenue still to win by the value win rate to get the value you must price, then divide by average contract value to get the count.
Does the 3x pipeline cover rule apply in Australia?
The 3x rule is Archdesk’s UK planning figure, and it is simply 1 divided by a 33% win rate. It applies to an Australian fit-out firm only if that firm’s own win rate is near 1 in 3; at 25% the same logic gives 4x, at 15% about 6.7x.
How many tenders a month should a small fit-out firm price?
A small fit-out firm targeting $3 million at an assumed $150,000 average job needs 20 jobs, so at a 25% win rate it prices 80 tenders a year, about 6.7 a month. Subtract signed work first, and price fewer if repeat clients supply a larger share.
Is pricing more open tenders a good way to grow a fit-out business?
Open tenders add volume at the lowest odds. At a 10% fair-share rate each job won costs 10 tenders, against about 2.2 from a repeat client at 45%. Archdesk’s own advice is that more tenders is not growth, just more estimating cost.
Pay-Per-Result appointments
See if we’re a fit
We book qualified sales appointments for you and you pay on results, not retainers. Our booking page asks a few quick questions so you find out in two minutes whether that model suits your business.
- 50,769+ appointments booked without cold calling.
- Pay-Per-Result pricing — you pay for booked, qualified calls.
- Pick your own time on our live calendar, no phone tag.
Why does tender cover differ by source? The go/no-go threshold table
Tender cover differs by source because a repeat client, a private invited list and an open tender carry very different odds, so each source needs its own win rate and its own go/no-go threshold.
The 45% repeat-client figure is Archdesk’s. The invited-list and open-tender rates are arithmetic assumptions: if you are one of four equally placed bidders, your fair-share odds are 1 in 4 (25%); one of ten, 1 in 10 (10%). E1 states that “win rates on public portals are typically much lower than those on private tender networks” in its guide to winning contracts (updated March 2026), because price becomes one of the main differentiators when many bidders chase one job.
| Source | Win rate used | Basis | Tenders per job won | Go/no-go threshold |
|---|---|---|---|---|
| Repeat client or occupier | 45% | Archdesk’s stated figure | about 2.2 | Price it if it fits live-job capacity and your minimum margin for the risk |
| Private invited list (about 4 bidders) | 25% | Fair share of 4 bidders (assumption) | 4 | Price it if you know the decision-maker and can state why you win in one line |
| Open tender (about 10 bidders) | 10% | Fair share of 10 bidders (assumption) | 10 | Price it only if you have an edge beyond price and spare estimating hours |
The one-line test comes from Archdesk’s guide: “If you cannot explain why you will win in 12 words, decline fast and refill the slot from a better source.” On open tenders, ask how many firms are pricing before you commit an estimator.
Want this done for you? We book qualified sales appointments on a Pay-Per-Result basis — you only pay for calls that actually land in your calendar.
The blended tender plan: how source mix changes the number you price
Source mix changes the tender count more than any single win-rate gain: the same 20 jobs need 102 tenders a year from one mix and 81 from another. Both plans use the threshold table’s win rates and a $600,000 average contract.
| Source | Plan A jobs | Plan A tenders | Plan B jobs | Plan B tenders |
|---|---|---|---|---|
| Repeat client (45%) | 8 | 8 ÷ 0.45 = about 18 | 10 | 10 ÷ 0.45 = about 23 |
| Invited list (25%) | 6 | 6 ÷ 0.25 = 24 | 7 | 7 ÷ 0.25 = 28 |
| Open tender (10%) | 6 | 6 ÷ 0.10 = 60 | 3 | 3 ÷ 0.10 = 30 |
| Total | 20 | 102 (8.5 a month) | 20 | 81 (6.75 a month) |
Winning all 20 jobs from open tenders at 10% means 200 tenders a year. Plan A’s blended win rate is 20 ÷ 102, about 19.6%; Plan B’s is 20 ÷ 81, about 24.7%.
Archdesk adds a concentration limit to its own three-source split: never let one source exceed 50% of the pipeline, so one lost relationship does not empty the year. Plan B gives repeat clients half the jobs but only 23 of its 81 tenders, so it stays inside that limit.
How do you work out your own fit-out tender win rate?
Your fit-out tender win rate is tenders won divided by tenders submitted and awarded over the last 12 months, and the denominator decides whether the number means anything. Three counting rules keep it honest:
- Drop tenders that were never awarded (project cancelled, client went quiet) from the denominator, but keep a count of them: if a third of your submissions never award, multiply the tender plan by 1.5.
- Count declined invitations separately. A tender you chose not to price is a go/no-go decision, not a loss.
- Measure by number and by value. A firm that wins 30% of tenders by count but 18% by value is losing its larger jobs, and its revenue plan should use the value rate.
Then split the result by source by tagging each line of the tender register as repeat, invited or open.
What clients score also varies. Procore’s Australian guide to winning tenders notes that some owners are all about price while others value time, presentation or the subcontractors you bring, so a loss on price and a loss on programme call for different fixes.
If we can’t make you money, we don’t deserve yours.
Pay-Per-Result pricing — performance-based alignment.
What does pricing 100 fit-out tenders a year cost in estimator time?
Pricing 100 fit-out tenders a year takes about 2,000 estimating hours if each tender takes an assumed 20 hours, roughly one full-time estimator at an assumed 1,800 productive hours a year. Plan A’s 102 tenders need about 2,040 hours; Plan B’s 81 need about 1,620, a saving of 420 hours from the source mix alone.
The cost of each tender is rarely what stops a fit-out firm. At an assumed $120 an hour, a 20-hour tender costs $2,400; against a $600,000 job at an assumed 15% gross margin ($90,000), the break-even win rate is about 2.7%. The real limits are estimator capacity and the live jobs your project managers and QSs can run, which is why Archdesk pairs pipeline cover with a cap on concurrent projects. For the break-even method in full, see how to work out whether a government tender is worth bidding; for the same bids-per-win logic in another trade, how many bids it takes to win commercial landscaping contracts.
Repeat and invited work comes from conversations, not portals: past clients, occupiers, architects and project managers. Builders working out lead volume rather than tender volume can use the builder reverse funnel calculator, and old priced-but-lost quotes are a source in their own right (see reactivating dead quotes in a trade business).
When to get help: if directors cannot keep up the client and consultant calls that fill the repeat and invited rows, that outreach can be handed over. LeadsNow, with 50,769+ AI-booked sales appointments since 2017 and 1M+ leads generated, books sales calls using AI calling, SMS and DM follow-up; its lead generation for construction companies in Australia page explains how that works for commercial builders and trades.
Rules of thumb for fit-out tender cover
These rules of thumb come from the arithmetic above; replace the inputs with your own register data.
- Tenders a year = (revenue target minus contracted work) ÷ average contract value ÷ win rate. At 33% that is 3x cover; at 25%, 4x; at 15%, 6.7x.
- Moving three of 20 jobs from open tenders to repeat and invited work cuts the plan from 102 tenders to 81 in the worked example, about 420 estimating hours at 20 hours a tender.
- Decline any tender where you cannot say in one line why you will win it.