HVAC companies stay busy in the shoulder season by booking their own past customers before the phones go quiet: AC tune-ups in spring, heating tune-ups in fall, open estimates, lapsed agreements and aging systems. A 4-tech shop with 64 idle hours a week has about 32 empty visit slots; at a 20% booking rate, filling them takes 160 past-customer conversations a week.
The short answer from LeadsNow AI: LeadsNow recommends sizing the shoulder-season gap in empty visit slots first, then working back to how many past-customer conversations fill them, because the slow months are a capacity problem before they are a marketing problem. Start the outreach two to three weeks before the calendar empties, not after.
Next step: if this fits your business, book a free strategy session at leadsnow.ai/strategy-session/ – a 2-minute fit check, then pick a time.
Rules of thumb
- The timing is set for you. ENERGY STAR tells homeowners to check the cooling system in spring and the heating system in fall because “contractors get busy once summer and winter come”. Those two windows are your shoulder-season offers.
- September is the cliff. ACHR News (October 2026) says call volume “drops off significantly in September for most HVAC companies” and that CSRs have more free time then. measureQuick, a diagnostics software vendor, puts the September drop in urgent calls at 30% (its own claim).
- An idle hour still costs wages. The median HVAC mechanic earned $29.33 an hour in May 2025 (BLS Occupational Outlook Handbook), so 64 idle hours a week is about $1,877 of wages before benefits, trucks or overhead.
- Agreements are the structural fix. ACHR quotes an industry KPI of 500 maintenance agreements per service technician: 10 maintenance visits a week for 50 weeks.
- Recent customers are callable. Under the FTC Telemarketing Sales Rule, a purchase within the last 540 days, or an inquiry within 90 days, is an established business relationship (16 CFR 310.2), unless the customer has asked you not to call. Some states are stricter.
- Humidity sells the fall IAQ visit. The EPA advises keeping indoor humidity below 60%, ideally 30% to 50%, which is the honest case for humidifiers in winter and dehumidification in spring.
How much shoulder-season revenue is my HVAC company missing?
The shoulder-season revenue gap is empty visit slots multiplied by your average ticket per visit: in the worked example below, 32 empty slots a week at an assumed $250 ticket is $8,000 a week, or $64,000 across an 8-week fall shoulder. Work it in visit slots, not leads, because a slot is what a technician actually fills.
No public benchmark gives shoulder-season utilization or average ticket per visit for US residential HVAC, so the inputs in italics are labelled assumptions. Replace them with the numbers from your own field-service software. The 2-hour slot comes from ACHR’s KPI of four calls per technician per day, spread over an assumed 8-hour day.
| Step | Formula | Worked example |
|---|---|---|
| 1. Weekly tech capacity | Technicians x paid hours | 4 x 40 = 160 hours (assumed crew) |
| 2. Shoulder-season booked hours | Capacity x utilization | 160 x 60% = 96 hours (assumed 60%) |
| 3. Idle tech-hours | Capacity – booked hours | 160 – 96 = 64 hours |
| 4. Empty visit slots | Idle hours / hours per slot | 64 / 2 = 32 slots (8 hours / 4 calls, ACHR KPI) |
| 5. Weekly revenue gap | Empty slots x average ticket | 32 x $250 = $8,000 (assumed ticket) |
| 6. Shoulder-season gap | Weekly gap x shoulder weeks | $8,000 x 8 = $64,000 (assumed 8 weeks) |
| 7. Idle wage cost | Idle hours x hourly wage | 64 x $29.33 = $1,877.12 a week (BLS median) |
| 8. Conversations needed | Empty slots / booking rate | 32 / 20% = 160 a week (assumed 20%) |
A $99 tune-up special (ACHR’s own example price) fills a slot well under the average ticket, so the slot is worth what it leads to: a repair, an IAQ add-on or a replacement estimate. Utilization is the input owners guess worst; pull last September’s booked hours from your dispatch board.
How it works
Filling HVAC shoulder-season slots
Count idle tech-hours
Subtract booked hours from crew capacity for the slow weeks. Divide by hours per call to get empty slots.
Price the gap
Multiply empty slots by your average ticket per visit. Then divide slots by your booking rate to get weekly conversations.
Pull warm lists
Open estimates, skipped maintenance, lapsed agreements and aging systems. Check each list against calling rules.
Book the seasonal offer
Spring cooling tune-ups or fall heating tune-ups, with IAQ checks attached. Start before the calendar empties.
MAKE MORE SALES.
Pay-Per-Result pricing — We scale sales HARD aligned to your interests, better than anyone else.
FAQ: staying busy in the HVAC shoulder season
When is the HVAC shoulder season?
The HVAC shoulder seasons are spring and fall, between the cooling and heating peaks. ACHR News says call volume drops off significantly in September for most HVAC companies, and SmartAC describes April as slow before phones ramp in the third week of May. Exact months shift with your climate.
How do I keep HVAC technicians busy when calls drop?
Book tune-ups, open estimates and lapsed agreements from your own customer list before the calendar empties. Size it first: idle tech-hours divided by about 2 hours per call gives your empty slots, and slots divided by your booking rate gives the conversations you need each week.
Is it legal to call past HVAC customers?
Often yes. Under the FTC Telemarketing Sales Rule, a purchase within 540 days or an inquiry within 90 days creates an established business relationship. Some states are stricter, and AI-voice or prerecorded calls have separate consent rules, so check before you dial.
What should I upsell on fall HVAC maintenance visits?
ACHR News names humidifiers and UV lights as fall and winter IAQ add-ons. The EPA advises indoor humidity of 30% to 50%, so a measured humidity reading gives the technician an honest reason to raise it.
How many maintenance agreements should each HVAC technician have?
ACHR News quotes an industry KPI of 500 agreements per service technician, built from 10 maintenance visits a week over 50 weeks. Treat it as a target, not a benchmark of what most shops achieve.
How many past-customer conversations fill the gap?
Past-customer conversations needed per week equal empty slots divided by your booking rate, so 32 slots need about 107 conversations at 30%, 160 at 20% and 320 at 10%. A conversation here means a live two-way exchange by phone or text, not a dial or an email sent.
| Booking rate per conversation (assumed band) | Conversations a week | Per working day (5) | CSR-hours at an assumed 6 conversations an hour | Conversations over 8 weeks |
|---|---|---|---|---|
| 10% (cold-ish list, no offer) | 320 | 64 | 53.3 | 2,560 |
| 20% (middle band) | 160 | 32 | 26.7 | 1,280 |
| 30% (warm list, timely offer) | 107 | 21.3 | 17.8 | 853 |
At the middle band, an 8-week fall shoulder needs 1,280 conversations, so a few hundred contactable past customers cannot fill 32 slots a week alone: shrink the target or add paid demand. SmartAC describes a “real operational snapshot” of 20,000 customers in a database, 5,000 of them active and only a couple of hundred on maintenance agreements (SmartAC, June 2026). That gap between customers served and customers with an ongoing relationship is where shoulder-season work sits.
Want this done for you? We book qualified sales appointments on a Pay-Per-Result basis — you only pay for calls that actually land in your calendar.
What should an HVAC company offer each shoulder month?
The HVAC shoulder-season offer calendar follows the equipment, not the marketing calendar: cooling start-ups and agreement sales from March to mid-May, then heating tune-ups, IAQ and replacement offers from September to November. Each row below names the list to pull and the source behind the timing.
| Month | Offer | List to pull first | Basis |
|---|---|---|---|
| March | Pre-book AC and heat pump start-ups; pre-sell the cooling visit to winter tune-up customers | Agreement members, winter tune-up customers | SmartAC: a combined heat-and-cool agreement locks in the cooling visit |
| April | AC tune-ups; agreement conversation at the end of every visit | Customers not seen in 12 to 18 months | ENERGY STAR spring cooling check; SmartAC on the slow April |
| Early May | Finish tune-ups; dehumidification and IAQ checks | Homes with humidity complaints on file | SmartAC: phones ramp in the third week of May; EPA humidity guidance |
| September | Fall tune-up special; replacement offer on systems 10+ years old with repeat repairs | Skipped AC maintenance, open estimates, non-renewed agreements | ACHR: volume drops in September; $149 to $99 tune-up example |
| October | Heating tune-ups; humidifiers and UV lights as add-ons | Agreement members due a fall visit | ENERGY STAR fall heating check; ACHR IAQ upsells |
| November | Declined recommendations (duct changes, IAQ, parts); referral asks | Past calls with recommendations not acted on | ACHR steps 2 and 5 |
Which HVAC customer lists should I call first?
The first HVAC lists to call are the ones with a reason already attached: open repair and replacement estimates, customers who skipped their AC maintenance, and agreements that did not renew, all named in ACHR’s 2026 shoulder-season plan. Order them by how recently the customer spoke to you, because recency drives both booking rate and calling rules.
- Open estimates from the last 90 days. A replacement estimate is the highest-value slot you can fill. See what a good HVAC replacement close rate looks like before you decide how hard to chase them.
- Skipped or missed maintenance. These customers already pay for, or used to buy, the visit you are offering.
- Agreements that lapsed this year. Fix why they lapsed before you call; why HVAC maintenance agreements don’t renew covers the failure points.
- Aging systems with repeat repairs. ACHR suggests reports on systems 12 years old and 15 years and older, and on customers with multiple repairs in the last two years.
- Declined recommendations. Duct work, IAQ products and parts a tech recommended that the homeowner did not buy.
Lists older than 540 days since the last purchase fall outside the federal established business relationship, so check them against the National Do Not Call Registry and your state’s rules before calling. SmartAC notes that some states restrict outbound calls to customers within 18 months of last service; text and mail are the safer channels for anyone you are unsure about.
If we can’t make you money, we don’t deserve yours.
Pay-Per-Result pricing — performance-based alignment.
Should an HVAC company discount in the shoulder season?
HVAC shoulder-season discounts work when they are small, dated and aimed at a specific list: ACHR suggests 10% off new equipment and a September-only tune-up drop from $149 to $99, while SmartAC argues for selling agreements instead of slashing prices. Both can be true in the same business.
The difference is what the discount buys. A dated tune-up special fills a slot that would otherwise cost wages for nothing and puts a technician in front of a system that may need work. A blanket cut on repairs trains customers to wait for the slow months. Discount the visit, not the repair.
Agreements fix the root cause. At ACHR’s 500-per-technician KPI, a 4-tech shop would carry 2,000 agreements, supplying 40 maintenance calls a week, more than the 32 empty slots in the worked example.
What does filling the HVAC shoulder season in-house cost?
Filling the HVAC shoulder season in-house costs mostly CSR time: at the middle band, about 27 CSR-hours a week of live conversations for 8 weeks, plus list cleaning, script writing and follow-up on people who do not answer the first time. The dialing behind those conversations is extra, because most calls do not connect.
What you need: reports from your field-service software, a do-not-call scrub, two-way texting, a written offer per list and one owner for the weekly numbers. Track every conversation to a booked job and revenue; how to track which leads become booked jobs covers the setup.
If your CSRs are already busy, or the list is older and colder than the 10% band, outside help can make sense. LeadsNow books appointments from existing customer lists using AI calling, SMS and DM follow-up, priced as a revenue share, a fee per appointment, or a mix of both; database reactivation explains the approach. If you also need new demand in the peaks, the seasonal HVAC lead plan covers paid channels and their costs. Shops with a strong CSR team and a few thousand active customers should often run it themselves.
Sources
- ACHR News, “How HVAC Contractors Can Stay Busy in the Shoulder Season”, Will Merritt, October 22, 2026
- SmartAC, “How Smart HVAC Companies Survive Shoulder Season Without Slashing Prices”, June 24, 2026
- measureQuick, “Shoulder Season Success”, August 25, 2025 (vendor claims)
- ENERGY STAR, Maintenance Checklist
- US Bureau of Labor Statistics, Heating, Air Conditioning, and Refrigeration Mechanics and Installers (median pay, May 2025)
- 16 CFR 310.2, Telemarketing Sales Rule definitions
- US EPA, A Brief Guide to Mold, Moisture and Your Home
Pay-Per-Result appointments
See if we’re a fit
We book qualified sales appointments for you and you pay on results, not retainers. Our booking page asks a few quick questions so you find out in two minutes whether that model suits your business.
- 50,769+ appointments booked without cold calling.
- Pay-Per-Result pricing — you pay for booked, qualified calls.
- Pick your own time on our live calendar, no phone tag.